grants· Updated

SEAI Non-Domestic Solar Grant: Business Guide

How the SEAI Non-Domestic Microgen Scheme works in 2026: who qualifies, how the €162,600 maximum is structured, and where business applications go wrong.

By Lumen Solar

Facts checked 25 July 2026. Grant schemes are revised regularly. Confirm current terms on the SEAI commercial solar PV grant page or ask us to confirm your exact entitlement.

If your business, farm, school or club has a roof and a daytime electricity bill, the Non-Domestic Microgen Scheme (NDMG) is the scheme that applies. It is administered by SEAI, it supports systems up to 1,000 kWp, and at the top end it is worth up to €162,600.

Here is how it works, including the parts that catch people out.

Who can apply

The scheme is deliberately broad:

  • Businesses of any size, from a single shop to an industrial site
  • Farms (though for most farm projects, TAMS at 60% is the better scheme, and you must pick one; the two cannot be combined for the same investment)
  • Schools, colleges and public sector bodies
  • Community organisations, sports clubs and non-profits

The core requirements: a non-domestic premises in Ireland with its own electricity connection (MPRN), and installation by an SEAI-registered company.

How the money is structured

Support is tiered by system size. The rate per kWp steps down as the system gets bigger, so small systems get proportionally more help, while the largest systems still attract the biggest total amounts, up to the €162,600 maximum at 1,000 kWp.

We deliberately don’t reproduce the per-band rate table here. SEAI revises the bands periodically, and a stale table sets an expectation that then has to be walked back. When we quote a system, we calculate your entitlement against the current scheme rules and show you the arithmetic.

For a typical SME roof in the tens of kilowatts, the grant generally covers a meaningful slice of the project, and for a profitable company it stacks with the tax treatment below.

The grant is only half the financial story

For a trading business, two other things often matter as much:

  1. Accelerated Capital Allowances. Solar qualifies as energy-efficient equipment, which lets a profitable company write the net cost (after grant) off against tax in year one instead of over eight years. It’s a timing benefit rather than free money. Our commercial page explains it, and your accountant should model it.
  2. What you no longer buy. Commercial electricity in Ireland typically lands at 25–35c/kWh fully loaded. Every unit generated and used on site is a unit off that bill, for 25+ years. Businesses that operate in daylight hours, such as manufacturing, retail, cold storage and offices, tend to consume most of what a well-sized system generates, because their demand peaks exactly when the panels do. How much, precisely, depends on your load profile, which is what we model before quoting.

The sequencing rules that lose people their grant

This is where applications fail, and none of it is difficult if it’s done in order:

  1. Apply first, install second. No work may start before SEAI issues your Letter of Offer. Starting early voids the grant, it doesn’t just reduce it.
  2. ESB Networks approval is separate. Grid connection consent (NC6/NC7 notification for smaller systems, full application for larger ones) must also be in place before installation. Allow four weeks or more.
  3. Documentation closes the loop. Commissioning certificates, compliance paperwork and photos are what release the payment. Incomplete paperwork is the most common cause of delay.

We run all three tracks in parallel and in sequence. It’s the least glamorous part of the job, and the part that most reliably protects your money.

How long it takes

From a standing start, a well-run commercial project typically needs six to ten weeks before installation can begin, covering the grant application and offer, then grid approval. The installation itself takes days rather than weeks for most roof-mounted systems. Planning permission is rarely a factor: since October 2022, rooftop solar on commercial, industrial and agricultural buildings is exempt without an area cap outside a small number of safeguarding zones near airports.

Where to start

Two numbers begin every sensible conversation: your annual kWh consumption and your unit rate, both on your bill. From those plus a look at the roof, we can tell you the sensible system size, the grant it attracts and the realistic payback, before you commit to anything.

Request a commercial assessment or call us on (090) 640 0180.

Insights

More from the blog

All articles
  • CSRD After the Omnibus: Who Reports Now

    The EU’s Omnibus directive rewrote sustainability reporting in 2026. Who is still in scope for CSRD, from when, and where on-site solar fits in.

    Read article

  • SEAI Solar Grants 2026: What You Can Claim

    Solar grants in Ireland for 2026: the SEAI domestic grant, the Non-Domestic Microgen Scheme and TAMS, and the rules that decide who qualifies.

    Read article

  • How to Read a Solar Quote

    No two solar quotes are laid out the same way. What to look for, which omissions matter, and the questions that separate a real design from a price per panel.

    Read article

Get started

Start with a free site survey

Tell us about your property and we will arrange a free site survey. There is no charge and no obligation at any point.

Get a free quoteCall (090) 640 0180

Mon–Fri, 9am–5pm · Free site survey