Your Energy Partner · Trading since 2013

The process

What actually happens, step by step

Solar projects go wrong in predictable places — grant sequencing, grid lead times, and surveys that never happened. Here is how we run one so those things do not bite.

  • Free survey
  • Grant guided
  • Certified on completion
Lumen Solar engineer commissioning a newly installed solar PV system

Accredited & registeredIn business 13 years

  • SEAI Registered
  • Safe Electric
  • Solar Ireland Member
  • Athlone Chamber Member
  • Based in AthloneTrading since 2013

Eight stages

From first call to a system you can forget about

Timings vary with system size, scheme processing and grid lead times. What does not vary is the order — and getting the order right is most of the job.

  1. First conversation

    Same day, usually

    You call or send an enquiry. We ask about the building, your bills and what you actually want solar to do — cut costs, add resilience, meet a reporting obligation, or all three.

    • Bring a recent electricity bill if you have one
    • Tell us if you have or plan an EV or heat pump
    • Say if backup during outages matters to you
  2. Free site survey

    Typically 1–2 hours on site

    An engineer visits and assesses the things that actually constrain a design: roof structure and condition, pitch and orientation, shading across the seasons, your consumer unit and supply, and where equipment can safely go.

    • Roof structure, covering and condition
    • Shading assessment — including low winter sun
    • Electrical supply, board capacity and earthing
    • Cable routes and inverter siting
  3. Design and quotation

    Within a few days

    We design a system sized against your consumption pattern, then quote it with the equipment actually named. Any yield or savings projection comes with the assumptions written down.

    • Named panels, inverter, mounting and battery
    • Expected generation for your specific roof geometry
    • Your grant entitlement, calculated not estimated
    • What is included — and what would be an extra
  4. Grant application

    Timing set by the scheme

    For the home grant, you apply to SEAI and receive the offer letter — a short online application we walk you through, with every detail it asks for supplied by us. No work begins before that letter is issued — starting early is the most common way a valid claim is lost.

    • Eligibility confirmed before you apply
    • We supply every detail the application asks for
    • We hold installation until the offer is in place
  5. Grid application

    Runs in parallel

    Connecting a generating system requires notification or agreement with the network operator, depending on size. We handle it. For larger commercial systems this can be the longest lead time in the project, so we start it early.

    • Notification or full application depending on system size
    • Export limits confirmed before the design is finalised
    • Registration completed after commissioning
  6. Installation

    Days for domestic, phased for commercial

    Scaffolding or access goes up, panels and mounting are installed, and the electrical work is carried out by a registered electrical contractor. Commercial work is phased around your operations.

    • Safe access appropriate to the building
    • Mounting specified for your roof type and exposure
    • All electrical work certified on completion
    • Site left clean and anything disturbed made good
  7. Commissioning and handover

    Final day on site

    The system is tested, commissioned and registered, monitoring is set up, and we walk you through what you are looking at — so you can tell whether it is working without ringing us.

    • Full electrical testing and certification
    • Monitoring configured on your phone or desktop
    • Warranties and documentation collected in one place
    • Grant claim completed and submitted
  8. Aftercare

    For the life of the system

    Solar needs little maintenance, but not none. We remain available for servicing, fault diagnosis and repairs — and for commercial and farm systems we recommend a planned maintenance agreement.

    • Inspection, cleaning and electrical testing
    • Fault diagnosis and repair
    • Monitoring alerts on underperformance

Good to know

Questions about the process

How long does an installation take?

A typical domestic installation is completed in a small number of days on site once the system is designed, the grant offer is in place and materials are scheduled. Commercial and farm projects run longer and are phased around your operations. We give you a specific timeline in your quotation rather than a generic estimate.

How do I get a quote?

Call us on the number at the top of this page or send an enquiry through the site. We will talk through what you need, arrange a free site survey, and give you a written quotation with the system design, the equipment specified and the grant position set out clearly.

How do I get paid for electricity I export?

Export payments come from your electricity supplier under the Clean Export Guarantee, not from the government. When we commission your system we notify ESB Networks (the NC6 or NC7 form), which is what registers you as a microgenerator; your supplier then applies its export rate to your account. With a smart meter your actual export is measured; rates vary by supplier, so it is worth comparing.

Does solar affect my BER or my house insurance?

Solar PV normally improves a BER, because it reduces the calculated primary energy use of the home — and a post-works BER assessment is part of the SEAI grant process anyway. On insurance: tell your insurer you have added solar, as with any alteration to the building. Cover for panels is routine.

Do solar panels actually work in the Irish climate?

Yes. Solar PV responds to daylight, not heat or direct sunshine, so panels generate on bright overcast days as well as clear ones. Output is strongly seasonal in Ireland — summer generation is far higher than winter — which is why we size a system around your year-round consumption pattern rather than a headline figure.

Do I need planning permission for solar panels?

Most domestic rooftop installations in Ireland fall under planning exemptions, and exemptions for rooftop solar have been broadened considerably in recent years. Exemptions carry conditions, and some buildings — protected structures and certain locations in particular — are treated differently. We confirm the position for your specific property at survey stage and tell you plainly if permission is needed.

Get started

Start at stage one

A phone call and a look at a recent bill is all it takes to find out whether this is worth pursuing for your property.

Get a free quoteCall (090) 640 0180

Mon–Fri, 9am–5pm · Free site survey