Your Energy Partner · Trading since 2013

Co. Roscommon

Solar Panel Installation in Co. Roscommon

Roscommon begins on the far bank of the Shannon from our Athlone base, and it is one of the counties we work in most — heavily agricultural, with a dispersed rural housing pattern that suits solar well.

  • Free site survey
  • SEAI grant guided
  • Local aftercare
Solar panel installation carried out by Lumen Solar in Roscommon

Accredited & registeredIn business 13 years

  • SEAI Registered
  • Safe Electric
  • Solar Ireland Member
  • Athlone Chamber Member
  • Based in AthloneTrading since 2013

Local context

Solar in Roscommon

Roscommon is a large, thinly populated, strongly agricultural county. Beef and drystock dominate, with sheep on the poorer land and dairy in the better parts. The characteristic property here is a detached house or farmhouse on its own site with a cluster of outbuildings — and that combination gives more usable roof area and fewer shading constraints than almost any urban setting.

Because holdings are dispersed and the county is served by a rural distribution network, questions about connection capacity and export limits come up more often here than in a town. These are answerable questions, but they need answering before a system is designed rather than after it is quoted, and it is one of the more common places we see other quotes go wrong.

Roscommon town, Boyle, Castlerea and Ballaghaderreen provide the commercial and service base for the county, and we work on both the domestic and light-commercial side across all of them. The Athlone side of the county — Monksland and the areas immediately west of the Shannon — is effectively part of our own local patch.

What we look for here

Roscommon-specific considerations

What a survey in Roscommon tends to focus on.

  • Grid connection and export limits need checking early

    On rural networks the permitted export capacity can constrain system size. We establish the position at survey stage so the system we quote is the system you can actually connect and register.

  • Outbuildings expand what is possible

    Where a farmhouse roof is small, awkward or shaded, a shed or store frequently offers a better mounting surface. It is common for the best array on a Roscommon property not to be on the house at all.

  • Farm systems should be sized to on-site use

    The value in a farm system comes overwhelmingly from electricity used on the holding rather than exported. We size against your actual load — pumps, parlour, refrigeration, workshop — instead of filling the available roof.

Services

What we install in Roscommon

The same range we offer everywhere — designed around the building in front of us rather than a standard package.

Simple process

Getting started in Roscommon

Four steps from a first phone call to a system generating on your roof.

  1. Talk to us

    Call us or send an enquiry. We ask about your building, your bills and what you want solar to do — before anyone talks about panels.

  2. Free site survey

    An engineer visits, assesses your roof, shading and electrical setup, and designs a system sized to your actual consumption.

  3. Grant & installation

    We guide you through the grant application and handle the installer and grid-notification paperwork, then install and commission the system with as little disruption as possible.

  4. Generate & monitor

    Your system goes live, you can see what it produces from your phone, and we stay available for servicing and support.

Grants

Grant support you can claim

We guide the application and handle the installer paperwork as part of the job. Below is what the three main schemes are worth — and the conditions that actually decide whether you qualify.

  • Homeowners

    €1,800maximum grant

    SEAI Solar PV Grant

    Paid at €700 per kWp for the first 2 kWp, then €200 per additional kWp up to 4 kWp.

    Home must have been built and occupied before 1 January 2021.

    See what this covers

  • Businesses & community

    €162,600maximum grant

    SEAI Non-Domestic Microgen Scheme

    Supports non-domestic systems up to 1000 kWp. Rates are tiered — the per-kWp rate steps down as the system gets larger.

    Open to businesses, farms, schools, public bodies and non-profits.

    See what this covers

  • Farms

    €54,000maximum grant

    Solar Capital Investment Scheme (SCIS) under TAMS 3

    Grant-aided at 60% against a ring-fenced investment ceiling of €90,000. Systems supported up to 62 kWp.

    Administered by the Department of Agriculture, not SEAI.

    See what this covers

Figures checked 25 July 2026. Grant schemes change — we confirm your exact entitlement against the current scheme rules before you commit to anything. Full grant guidance.

Get started

Book a free survey in Roscommon

Tell us about the property and we will arrange a visit. No charge, no obligation, and a straight answer on whether solar is worth doing.

Get a free quoteCall (090) 640 0180

Mon–Fri, 9am–5pm · Free site survey